Baseline by Version Control
Before generating a baseline by Version Control, the project must have been fully analyzed, and a version control script should have been created in the Project Properties’ Version Control Configuration tab.
Select Baseline by Version Control, and then click Generate Project Baseline and save the new options. The old warnings will be suppressed.